Industry

Power Generation

We’ve assisted major utility companies and EPC firms with generation and co-generation of power for — well, over a generation. Our experts can advise on all areas within the industry including project implementation, operations and maintenance or investigating the cause of incident, such as a turbine failure.

As the energy transition progresses, we are expanding our expertise beyond fossil fuels to include renewable power generation. Our consultants have successfully implemented offshore wind farms and conducted valuations of wind energy assets.

Our clients value our real-world experience to assist with the engineering complexities of EPC disputes surrounding power generation projects.

Case Studies

When Gas Is Curtailed, Should the Invoice Be Too?

October 20, 2026

When severe winter weather disrupts natural gas deliveries, pipeline curtailments can lead to complex disputes over payment for gas supplied to pipelines exceeding the quantities scheduled for delivery to customers. Baker & O’Brien evaluated the parties’ conduct, pipeline communications, and the operational circumstances surrounding a disputed natural gas transaction. Our expert analysis and deposition testimony addressed the technical and operational issues, and the court resolved the dispute through summary judgment before trial.

Do Not Open the Electrical Panel Door

January 29, 2024

Introduction: While erecting a scaffold at a power plant, a scaffolder made a tragic mistake when he opened the electrical panel door protecting energized high-voltage equipment. We identified the applicable electrical generation regulations, industry standards, responsibilities of independent contractors, and individual human factors to determine the incident’s cause and responsibilities. Our expert report of opinions was used to negotiate a settlement.

Power Plant Project – did incomplete control narratives result in out-of-control project schedule

July 28, 2023

A disagreement between an EPC contractor and its subcontractor led to a dispute about the causes and impacts of delays and cost escalation for constructing a combined cycle power plant. We reviewed the project documents, records, and correspondence and compared the significance of the delays in the control narrative deliverables to the overall project delays and schedule milestones. We produced a technical expert report, followed by a joint expert report, and provided oral testimony at the arbitration hearing.